Proses Melukis Wayar Keluli Tahan Karat

Proses Melukis Wayar Keluli Tahan Karat

Proses Melukis Wayar Keluli Tahan Karat

1. Process Flow

The operation Stainless Steel Wire Drawing Process entails the following steps:

  • Construction Preparation: Organize materials and tools.
  • Setting Out: Mark positions accurately.
  • Cutting: Precisely cut materials to required lengths.
  • Welding and Installation: Employ appropriate welding techniques and verify welding parameters.
  • Grinding: Ensure welds meet quality standards.
  • Weld Inspection: Check welds for defects.
  • Polishing: Achieve smooth and polished finish.

2. Main Construction Methods

  1. Site Stakeout: Accurately measure pole lengths before construction.
  2. Material Cutting: Cut materials precisely with a maximum allowable deviation of 1mm.
  3. Welding Process: Select suitable welding parameters and verify through testing.
  4. Degreasing and Decontamination: Clean welding surfaces thoroughly before welding. Use appropriate chemicals if needed.
  5. Welding Technique: Utilize thin stainless steel electrodes and smaller welding currents. Ensure firm and full welds with uniform appearance and no defects.
  6. Grinding and Polishing: Use an angle grinder to smoothen uneven welds. Polish welds until smooth and free from marks.

By following these steps and methods, stainless steel wire drawing operations can achieve high-quality results.

Teda Ganghua Metal -17 tahun

Bawa spesifikasi terperinci ke hubungi saya jika kamu perlu
Kami mempunyai kualiti yang tinggi dan harga yang berpatutan
📧 [email protected]
Whatsapp: (+86) 138 2059 7807
Selamat datang ke laman web kami! https://www.tedametal.com/ & https://www.teda-metal.com/ & https://www.teda-aluminum.com/